Here are the documents we’ve received from the city about the 5G Fiber Optic project.
The addresses highlighted in the city documents are the following:
- 2463 Dulzura Ave
- 2404 San Marcos Ave
- 2401 Kalmia St.
- 2405 Kalmia St.
- 3124 Maple St.
- 3106 Laurel St.
- 2404 32nd St.
Construction Plan (3124 Maple St, 3196 Laurel St, 2463 Dulzura Ave, 3210 Kalmia St)
Construction Plan (2414 San Marcos, 2405 Kalmia, 2404 32nd St, 3205 Maple St)